The Soan River Bridge, which was closed for repairs on June 28, 2023, is set to reopen on August 14, 2023. The bridge connects Rawat and Kutchery Chowk in Rawalpindi, and its closure had caused major traffic disruptions in the area.
The repairs to the bridge were carried out by the Frontier Works Organization (FWO). The FWO said that the repairs were completed on schedule and that the bridge is now safe to use.
Read more
Sindh Government to Build Low Cost Housing Units in Scheme 45
The reopening of the Soan River Bridge is a major relief for commuters in Rawalpindi. The bridge is a major artery in the city and its closure had caused major traffic jams. The reopening of the bridge will help to ease traffic congestion and improve the flow of traffic in the area.
The FWO said that it is committed to providing safe and reliable infrastructure to the people of Pakistan. The completion of the repairs to the Soan River Bridge is a testament to the FWO’s commitment to this goal.
Some Other Details About the Soan River Bridge Repairs
- The bridge was closed for repairs after a portion of it collapsed.
- The repairs involved the replacement of damaged girders and beams.
- The FWO used high-quality materials and construction methods to ensure the safety of the bridge.
- The repairs cost Rs. 100 million.
- The bridge is now safe to use and will be reopened to traffic on August 14, 2023.
![Soan River Bridge](https://ejlaal.net/wp-content/uploads/2023/08/Soan-River-Bridge-1-convert.io_-1.webp)
![Soan River Bridge](https://ejlaal.net/wp-content/uploads/2023/08/Soan-River-Bridge-3-convert.io_-1-1024x768.webp)
![Soan River Bridge](https://ejlaal.net/wp-content/uploads/2023/08/Soan-River-Bridge-2-convert.io_-1-1024x576.webp)